DSM
DSM Corporate  Print  A  A  A 

Brunner: triplication of installed biogas capacity in Bavaria possible (Germany)

8/7/2012

Agricultural Minister Helmut Brunner (CSU) considers the triplication of bavarian biogas production capacity as being feasible. “In Bavaria we have currently 2.400 biogas plants with an installed capacity of 700 MW. From my point of view, theoretically, an installed capacity of 2.000 MW is reachable through both new constructions and optimisation of existing plants”, said Brunner.

Source: EUWID Neue Energien

 
News archive

Quick Links

Subscribe to our newsletter

 

 

More information

Contact details

Legal

Other languages